[Skip to Content]
Port of Oakland Mobile Logo
JOIN USFull Menu
Image of Port of Oakland's TraPac concludes $67 million buildout

Port of Oakland’s TraPac concludes $67 million buildout

Marine terminal nearly doubles size, adds new ship berth and three more cranes

Press Releases, Seaport
January 24th, 2019

Oakland, Calif. – Jan. 24, 2019: A $67 million waterfront expansion concluded at the Port of Oakland this month, as TraPac marine terminal opened its newest vessel berth to arriving container ships.

The milestone signals completion of a 2-year project at Oakland’s second-largest terminal that has:

  • Nearly doubled TraPac’s footprint from 66 to 123 acres;
  • Boosted its fleet of ship-to-shore cranes from four to seven; and
  • Added a third 1,400-foot-long dock for berthing mega container ships.

“We are grateful to dockworkers, truckers, carriers, cargo owners and all of our stakeholders for working with us during this buildout,” said TraPac Operations Vice President Brian Bauer.  “We forecast continued cargo growth in Oakland and we are ready for it.”

TraPac officially began its new era in Oakland this month when the container vessel Bay Bridge tied up at Berth 25.  Fittingly, the ship moored in Oakland’s Outer Harbor near the San Francisco Oakland Bay Bridge.

TraPac’s expansion is the latest in a series of significant investments at the Port of Oakland.  Last November, Lineage Logistics and Dreisbach Enterprises opened Cool Port Oakland, a $90 million refrigerated distribution center.  Last June, Oakland International Container Terminal completed a $14 million project to heighten four cranes.  TraPac has said it will raise two cranes, as well.

“It’s gratifying to see tenants investing in Oakland’s future,” said Port Maritime Director John Driscoll.

TraPac handles about 15 percent of the containerized cargo moving through Oakland.  Much of it is refrigerated cargo destined for Japan, a major Oakland trading partner.  TraPac said that during expansion, it increased plug-in spaces for storing refrigerated containers from 388 to 860.

As part of its buildout, TraPac last summer opened a new gate complex for harbor truck drivers.  It also purchased nine new pieces of cargo-handling equipment to lift containers.

TraPac signed a 14-year-lease with the Port in 2016 as a precursor to its expansion.

About the Port of Oakland

The Port of Oakland oversees the Oakland Seaport, Oakland International Airport, and nearly 20 miles of waterfront including Jack London Square. The Port's 5-year strategic plan - Growth with Care - pairs business expansion with community benefits, envisioning more jobs and economic stimulus as the Port grows. Together with its business partners, the Port supports more than 73,000 jobs in the region and nearly 827,000 jobs across the United States. Connect with the Port of Oakland and Oakland International Airport through Facebook, or with the Port on Twitter, YouTube, and at www.portofoakland.com.

Media Contacts

Mike Zampa
Port of Oakland
Communications Director
(510) 627-1565
[email protected]

Marilyn Sandifur
Port of Oakland
Port Spokesperson
(510) 627-1193
[email protected]

 

###