Project Location
In Oakland at the 5th Avenue Overhead on I-880 from 10th Avenue to Oak Street.
General Project Description
The 5th Avenue Overhead on I-880 is to be replaced. Several freeway ramps and local streets will be modified/reconstructed to accommodate the new structure. The new structure will follow the same alignment and general profile of the existing structure and will be approximately 46 feet wider. The additional width will provide for freeway shoulders and a southbound auxiliary lane from the Oak Street on-ramp. The southbound auxiliary lane is a separately approved project and is being added to this project for construction purposes.
Purpose and Need
The existing structure is vulnerable to damage in the event of a major earthquake. It was determined that it is better to replace the structure rather than to retrofit the existing bridge.
Funding Status
The project is programmed in the SHOPP (State Highway Operations and Protection Program) in the 2004/5 fiscal year.
Estimated Cost
Bridge $85,000,000
District $16,500,000
R/W $4,200,000
Total: $105,700,000
Proposed Construction Schedule
Begin Construction January 2005
Complete Construction January 2010
Significant Issues
Impacts to Union Pacific Railroad facilities as well as impacts to Port of Oakland property as it relates to the Port’s redevelopment plans for the waterfront area. An existing Art Building near the project site owned by Peralta Community College District is proposed to be replaced and relocated. The project will provide for a clear span over the Lake Merritt Channel and will remove the existing bridge columns from the Channel.
Project Manager
Stanley Gee (510) 286-4935
Back

Oak-to-Ninth District
60 Acres on San Francisco Bay
The Port released a Request for Qualifications (RFQ) for this development opportunity in March 2001, and selected a development team (see below) for negotiations in September, 2001. The Port and our development partner will begin the preparation of a Specific Plan for the entire 120-acre Oak-to-Ninth District in mid-2002. Contact Barbara Szudy if you have questions.

Oakland Harbor Partners, LLC was selected for negotiations by the Board of Port Commissioners on September 4, 2001.

Oakland Harbor Partners, LLC

Michael Ghielmetti, Vice President
Signature Properties
4670 Willow Road, Suite 200
Pleasanton, CA 94588
(925) 463-1122
mghielmetti@sigprop.com

Dana G. Parry, General Counsel
Reynolds & Brown
1200 Concord Avenue, Suite 1088
Concord, CA 94520
(925) 674-8400
LODGP@aol.com

     
View Oakland Harbor Partners, LLC, Response to the 3/15/01 RFQ - This file has been submitted by the developer. The Port of Oakland does not take responsibility for file size or content. Please note that these files will take longer than usual to download.